Call Instant Quote Free Estimate
Real job by West Coast Flooring

How do you test a concrete slab for moisture?

From West Coast Flooring, 18+ years in business · Updated

A concrete slab is tested with either a humidity probe set into the slab or a calcium chloride dome that measures moisture coming out over a day.

Why the test matters

Concrete can give off water vapor from the ground even when it looks dry. Too much moisture under a glued or floating floor can make planks cup, lift or come loose, and flooring makers set their own limits for it.

The two common tests

  • Relative humidity probe: a small hole is drilled into the slab and a probe reads the humidity inside the concrete (ASTM F2170).
  • Calcium chloride test: a dish of salt is sealed under a dome on the slab and weighed after about a day to see how much vapor came out (ASTM F1869).

What happens if the slab is too wet

A moisture-blocking adhesive or a separate membrane goes down first, or the install waits until the slab dries. See how it all fits together in our guide to gluing engineered hardwood to a slab.

Related Service Engineered Hardwood Installation Real wood glued down over concrete slabs, with moisture testing and leveling first. See our engineered hardwood service →

More about our engineered hardwood installation.